The Cam-Lock Advanced Guardrail System (AGR) is designed to be ultra safe when erecting and dismantling a scaffold tower. Instead of individual braces connecting the tower, the AGR design simply makes use of cleverly designed frames to take the place of the braces, this means less parts but also a constant handrail throughout construction & dismantling. This is fast becoming the preferred choice on site. The AGR tower comes in working heights from 4.2m up to 10.2m.